Dromore Station Road, between Stanley Road and State Highway 1
Water main installation
Withells Road, between State Highway 1 and Maronan Ealing Road
Ealing Road, between State Highway 1 and Old Main South Road
Shoulder widening and major resurfacing works on State Highway 1
Ealing detour - Old Main South Road, Tilsons Road, SH1
Withells detour - Maronan Ealing Road, Hinds Arundel Road, Delamaine Street, SH1
Philip Street, between Walker Street and Grigg Street
Watermain installations
Residential access is to be maintained onsite
Line Road, between Dolma Street and Methven Chertsey Road
These closures are to be in place for 24 hours a day. Roads to be re-opened once works have been completed or when safe to do so.
Stage 1 - Wastewater renewals
Traffic will be detoured via Methven Chertsey Road and McCloys Road
OR
Dolma Street, Main Street (SH77), and Methven Chertsey Road
East Street, From Wills Street to Havelock Street
Cameron Street, From East Street to Baring Square East
Baring Square East, Full length from Cameron Street
Event - Ashburton Market Day 2025
Ashburton River Road, between Longs Ford Road and Pudding Hill Road
Longs Ford Road, between Ashburton River Road and Dip Road
Of the two road closures, only ONE will be in place at any time.
Water main installations and testing
Oxford Street, between Beach Road and Wellington Street
Closure to be in place daily from 8am-5pm with the road to be re-opened at the end of each day until works completed
Undergrounding of cables and pole removal
Ashburton Staveley Road, between Walkhams Road and Driscolls Road
Stock underpass construction
Detour via Methven Highway 77 and Thompsons Track
Grove Street, at Wilkin Street intersection
Wilkin Street, at Grove Street intersection
Watermain installations
Mason Place, full length from Churchill Avenue intersection
Stage 2: Total Closure
Closure to be in place 24 hours a day
Watermain installation
Line Road, between Dolma Street and McCloys Road
Please Note: Dates are indicative at this point for this stage with all going to plan.
These closures are to be in place for 24 hours a day. Roads to be re-opened once works have been completed or when safe to do so.
Stage 2 - Wastewater renewals
Line Road, Methven Chertsey Road, Cairnbrae Road
No Entry from Methven Chertsey Road. Restricted to one-way traffic entering from Line Road and exiting out onto Methven Chertsey Road.
Please Note: Dates are indicative at this point for this stage with all going to plan.
These closures are to be in place for 24 hours a day. Roads to be re-opened once works have been completed or when safe to do so.
Stage 2 - Wastewater renewals